RFP - Request for Proposal at Faro

 

The Yukon Contractors Association would like to share the following procurement opportunities related to the Faro Mine Complex in Faro, Yukon.

Attention:  RFP - Request for Proposal 

Re:  049C25R - Backwash System Improvements & Media Replacement at CVPTP-C/S

Description

As the Main Construction Manager for the Faro Mine Complex, Parsons Inc. (“Parsons”), is requesting a proposal (“Submission”) from each respective proponent (“Bidder”) for the Backwash System Improvements & Media Replacement at CVPTP - Structural/Civil Project (“Project”) at the Faro Mine Complex in Faro, Yukon. This Project consists of civil and structural work ahead of the installation of a new backwash system at the Cross Valley Pond Treatment Plant. This would include, but is not limited to the following: loading, transporting, placing, and compacting base course and sub-base course gravel for construction of building pad (for future backwash system), and pipe bedding. Trenching, placing and compacting bedding material, installing HDPE drainage pipes, and backfill. Coordinating installation of rig mats, Konkast 1430 drainage channel, and steel grating. Excavating of existing road embankment, construction, and compaction to allow for installation of lock block retaining wall. Design and installation of temporary shoring or bracing, as required for the installation of the lock block retaining wall.

Question Acceptance Deadline

2026/04/22 02:00:00 PM PDT

Closing Date

2026/04/28 02:00:00 PM PDT

MERX Website Link

Faro – 049c25r - Backwash System Improvements & Media Replacement At Cvptp-c/s - 049C25_R | MERX

For More Information

Julia Reziapova

julia.reziapova@parsons.com

 

YCA is continuing to explore ways to better support member communication and ensure that contracting opportunities like this are visible and accessible to our local construction community.

Kind regards,

Yukon Contractors Association

 

ADVANCE NOTICE

Attention: Advance Notice

Re: APN_034S25 - Faro Mine Remediation Project – 034S25 - Tse Zul Camp Operations 

The advanced procurement notice for a Work Package being issued by Parsons Inc. for the Faro Mine Remediation Project (FMRP) has been posted publicly.  View information related to this work on the MERX website through the link below. Documentation will be provided when the tender is posted.

 Description

As the Main Construction Manager for the Faro Mine Complex, Parsons Inc., will be requesting proposals for provision of camp operations services for the 288-person Tse Zul Camp. Camp services include catering, cleaning, security, maintenance and utilities/services.

As this is the Advanced Procurement Notice, no documentation is posted with this notice.  Please note that the Closing Date and Term dates provided are anticipated dates only. The actual Closing Date (Sourcing Closing Deadline) and Term dates shall be the date stated in the RFP, as may be revised from time to time by addendum.

MERX Website Link

https://www.merx.com/solicitations/open-bids/Faro-Mine-Remediation-Project-034S25-Tse-Zul-Camp-Operations/0000319195?origin=0

Closing Date: 

2026/05/15 02:00:00 PM PDT

This is the advanced procurement notice for the listed project. This is not a request for submissions. Documentation will be provided at the time the tender is posted. 

For more information contact:

Brad Taylor

brad.taylor@parsons.com 

 

YCA is continuing to explore ways to better support member communication and ensure that contracting opportunities like this are visible and accessible to our local construction community.

Kind regards,

Yukon Contractors Association

 

Scope of Requirement

The Town of Watson Lake (the “Town”) is inviting bids for the supply, delivery and installation of one (1) fabric storage building as per specifications referred to in Schedule T-6.

1         Instructions - RFT Process

1.1          Registration

Proponents become registered through MERX or by contacting the Executive Assistant by email at cdo@watsonlake.ca. Registration will ensure that all potential addenda issued are distributed appropriately.

1.2          Estimated Timeline

The Town’s intended schedule for awarding the Contract is as follows:

Action

Estimated Date*

RFT Release

MAR/06/2026

Deadline for inquiries/measurements

MAR/20/2026

Closing Date and Time

MAR/27/2026

Award of Contract (Tentative)

APR/21/2026

Delivery Date

120 Days after Award of Contract

*The dates listed above are estimates and the Town reserves the discretion to change any of the above dates. 

1.3          Tender Submission

Bids must be submitted electronically in a password protected format by email to cdo@watsonlake.ca. Upon closing an email will be sent requesting the password.

Please see the full RFT Document and details HERE

YCA is continuing to explore ways to better support member communication and ensure that contracting opportunities like this are visible and accessible to our local construction community.

Kind regards,

Yukon Contractors Association

 

 

 

Notice of Project: Kwanlin Dün First Nation Community Retrofit Initiative

The Yukon Contractors Association is sharing the following Notice of Project on behalf of the Kwanlin Dün First Nation (KDFN) regarding an upcoming multi-year community retrofit initiative in Whitehorse, Yukon.

This project presents upcoming opportunities for construction management services and future subcontractor participation.

Project Overview

The KDFN Community Retrofit Initiative is a deep energy retrofit program aimed at improving the performance, durability, and comfort of approximately 100 homes within the KDFN community.

The scope of work includes:

  • Exterior finishing, insulation, and air-sealing (above and below grade, including attics)

  • Window and door replacement

  • Heat pump and HRV installation, including electrical upgrades

Project Timeline

  • Construction start: May 2026

  • Substantial completion: November 2027

  • Final project close-out: March 31, 2028

Construction Management Services

KDFN is seeking a Construction Manager (CM) to provide pre-construction, construction, and post-construction services, including the hiring and coordination of subtrades.

Key RFP dates:

  • RFP release: December 10, 2025

  • RFP close: January 15, 2026

  • RFP documents available by contacting: tenders@earthrise.eco

Subcontractor Opportunities

Qualified contractors may have the opportunity to bid on trade packages for this project during 2026.

📄 Full project details are available in the PDF notice: [Download the Notice of Project (PDF) HERE]